Beijing's 5th Ring Road (Simplified Chinese: 五环路, Traditional Chinese: 五環路, Hanyu Pinyin: Wǔ Huán Lù, China Road Numbering: S001 (Beijing)) is a ring road encircling the city about 10 kilometres away from the city centre. It takes the form of an expressway and is 98 kilometres in length. Being a ring road, it has no natural start or end point, although the "0 km" mark is found near the northeastern stretch at Laiguangying, at the intersection with the Jingcheng Expressway. The expressway ring road is a provincial-level road in Beijing municipality.

All of Beijing's expressways, except for the Jingha Expressway, are interlinked with the 5th Ring Road.

Portions of the expressway have a maximum speed limit of 90 km/h, with the remainder imposing a speed limit of 100 km/h. There is a universal minimum speed limit of 50 km/h.

The 4th ring road has three lanes in each direction, for a total of six lanes.

Contents

History

The route was originally called the "1st Expressway Ring Road", as it would take the form of an expressway, and therefore become the city's first expressway ring road. However, given the fact that the 2nd Ring Road, 3rd Ring Road and 4th Ring Road were in existence, re-ordering it as a ring road with a number value of 1, especially as it was outside the 4th Ring Road, looked odd. Therefore, it was renamed the 5th Ring Road, after some debate.

Work began soon after and the first portion of the ring road opened in 2001, linking the Badaling Expressway with the Airport Expressway. Further stretches of the road were soon opened. By mid-2003, half of the ring road was open, from the western end connecting the West Chang'an Avenue to the interchange in the southeast with the Jingjintang Expressway.

The ring road was completed in its entirety on November 1, 2003, with the intersections with the Jingshi Expressway and the Jingkai Expressway. Also completed on that same day was the Xiaoyue Tunnel -- noticeable for being the only tunnel on any of the 5 Ring Roads of Beijing.

The 5th Ring Road is home to the Shifeng Bridge. This bridge was built and actually had to be rotated after it was built to link the two ends of the southwestern 5th Ring Road together. Underneath the bridge ran several important rail lines that could not be interrupted while the bridge was being built, which made it impossible for the Shifeng Bridge to be built like a normal bridge. It was instead constructed in parts extending the expressway as it went along. The completion of this colossal work accelerated the completion of the entire ring road.

At night, the Shifeng Bridge looks spectacular. It apparently is a trademark bridge of the expressway ring road.

Recent history

By mid-December 2004, a second exit lane was fitted for the Wangjing Science and Technology Park exit (clockwise direction). Previously, traffic used to clog up the entire ring road (at around 6 p.m. - 7 p.m. local time every workday) near that exit, as it is very close to Wangjing. Also, a second exit liaising directly with Wangjing is under construction; it is very close to the Wangjing filling station on the ring road (clockwise direction again).

Tolls

When the 5th Ring Road was completed (and even while segments were already open to the traffic), the expressway became a toll ring road. The charge was 0.5 CNY per kilometre as a minimum for small vehicles (which would equate to just around 6 cents U.S.).

The charge, although small, was exorbitant for many drivers, who shied away from the expressway. Further protests derived from the apparent fact that drivers were being charged the full CNY 5 for just one kilometre of the road, from Yizhuang to the Jingjintang Expressway. Additionally, users of the Badaling Expressway and the Jingkai Expressway, which have toll gates within the 5th Ring Road, moaned about being charged twice - once for the 5th Ring Road, and once again for the expressway connecting the ring road.

Beijingers soon learned to avoid this pricey path at all costs, preferring to sit out hours in jams on the 4th Ring Road and roads more central to Beijing. Thus, the 5th Ring Road became a virtually "wasted" ring expressway. As a result, this expressway was the subject of a heated debate in 2003. It became apparent that the 5th Ring Road was made just for those who could afford both the petrol and the tolls. Meanwhile, it became a kind of an unofficial test track for new drivers, who racked up spectacular (and, strictly speaking, illegal) speeds on the nearly empty expressway.

With Shoufa, the company running the expressway, unwilling to budge, standing firm to its view that the prices were authorised by the local Price Bureau, and with enough disgruntled Beijingers posting on message boards demanding the removal of the tolls, the authorities stepped in at the end of December 2003 and decreed that the road be made free on the first day 2004. (At the same time, all charges for expressway exits within the confines of the 5th Ring Road were also done away with.) When the tolls were removed, usage of the 5th Ring Road gradually increased. The ring road previously managed with only 10% of its total designed capacity.

The expressway ring road, even without the charges, remains uncrowded today, except for any occurrence of a serious accident.

Bridges on the 5th Ring Road

Note: ↑ denotes an overpass, ↓ an underpass, and ⇆ an interchange bridge with exit.

Northern 5th Ring Road

Eastern 5th Ring Road

Southern 5th Ring Road

Western 5th Ring Road

List of Exits

Symbols: ↗ = exit (✕ = closed), ⇆ = main interchange; S = service area.

Clockwise direction

Eastern 5th Ring Road

Anticlockwise direction